Tecmes method

This is

Tecmes Method

Each machine is a story and it comes from people.

With Tecmes Method we want to inform you about every single step of assembly construction machines.

1.

Customer Samples

2.

Process analysis and preliminary quotation

3.

Specific quotation

4.

Line design

5.

Materials supplies

6.

Machinery construction

7.

Internal testing

8.

FAT at Tecmes

9.

Shipment

10.

Installation

11.

SAT at customer plant

12.

Training

13.

After-sales

1.

Customer Samples

Sales Department is dedicated to handle the first contact with the customers, getting preliminary information like product samples and drawings.

The goal is to understand the assembly process and the required productivity.

2.

Process analysis and preliminary quotation

Mechanical Department provides a feasibility study.

Customer receives a draft layout, a preliminary description of the stations and a budget quote.

3.

Specific quotation

If the budget quote is positive, we prepare a specific and detailed quote with more information.

Mechanical Department studies the production details; the machine is designed with the customer.

At the end of this phase, will be forwarded a detailed layouts, 3D studies and a precise description of the process with final quote.

4.

Line desing

When the final quote is accepted, we do a kick-off of the machine.

Mechanical Department works on the definitive design, keeping the customer milestones.

5.

Materials supplies

When the mechanical project has been confirmed by the customer, we move to materials procurement.

Tecmes has a Quality Control Department with a strict protocol to check the components.

6.

Machinery construction

When we have the materials, the Production Department start the machine build-up.

7.

Internal testing

Final internal testing when the machine is ready.

8.

FAT

After the final setting machine, we proceed with FAT (factory acceptance test) with the customer.

Together with the customer we verify the acceptance protocol, base on the agreement.

9.

Shipment

After positive FAT, the machine is disassembled and packaged for shipment to the customer’s premises.

We can arrange insured shipping by air, ship or track based on the destination.

Each customer has always the right to organize the shipment independently.

10.

Installation

In this phase, our techical employees take care of the installation at customer’s site.

11.

SAT

The machine is ready for the SAT (site acceptance test).

Together with the customer we verify the acceptance protocol, base on the agreement.

12.

Training

Training with the operators during the installation of the machine.

13.

After-sales assistance

The after-sales service is always available for customes by phone or email.